If 10 men can complete a piece of work in 30 days how many men are requiredto complete the same job in 25 days?

Respuesta :

AL2006
AL2006 AL2006
  • 22-07-2014
We must assume that all workmen work at the same rate, and keep it up forever.

More men ==> fewer days

so the proportion is:    30/25 = x/10

Cross-multiply the proportion:

300 = 25 x

Divide each side by 25 :

x = 300/25 = 12 men
Answer Link

Otras preguntas

A painter painted about half a room in half a day. Coley estimated the painter would pain 7 rooms in 7 days. Is Coley's estimate reasonable? Explain
The dot or scalar product of two (3d) vec- tors ⃗a = ⟨a1,a2,a3⟩ and ⃗b = ⟨b1,b2,b3⟩ is defined as 3
⃗a • ⃗b = a i b i = a 1 b 1 + a 2 b 2 + a 3 b 3 . i=1 I
Jonas cut a piece of rope into 6 pieces that were each 5 3/8 inches long how long was the original piece of rope?
Accented notes that run against the regular pulse of the musical meter are referred to as
Use mercantilism in a sentence
Fernando paid 2.80 for potatoes .Potatoes cost 0.25 per pound . How many pounds of potatoes did Fernando buy?
choose any 3 digit number describe how to find the number that is 10 more
The height of Gateway Arch shown on Missouri quarter is 630 feet or 7,560 inches.Find how many 4-inch stacks of quarters make up the height of Gateway Arch.If t
Explain why the 4 building blocks of “competitive advantage” can make an organization more successful
Use the term "concentration" in a sentence about liquids that conveys its meaning. (9 points)