katianCarlanaj
katianCarlanaj katianCarlanaj
  • 21-11-2015
  • Chemistry
contestada

Which of the following is considered a major process flow structure?
a. Lean Manufacturing
b. Project
c. Fabrication
d. Lead Time

Respuesta :

frontloader13 frontloader13
  • 22-11-2015
Since lead time is the time period between the starting and completion of producing a product, lead time is a major process flow structure.
Answer Link

Otras preguntas

Explain the causes of war, giving examples of recent conflicts.
For breakfast, a customer can choose two different items from the following list: eggs pancakes waffles oatmeal bacon or muffin. How many different breakfast me
how do i solve this. a-12=-34
What do you think your weight would be if you were floating in space a long way from any planets? Explain your answer.
nine months is what percent of a year
7) A 3-gram gold ring occupies a volume of 0.341 cubic centimetres (cc). Find the mass density of gold, expressed as the unit rate of mass, in grams, to volume,
You are downloading a song. The percent y(in decimal form) of megabytes remaining to download after x seconds is y=-0.1x+1. Interpret the x- and y- intercepts.
The Cuban Revolution resulted in A) increased trade with the United States. B) a Cold War ally with the United States. C) a government that soon adopted com
Which is bigger 3/7 or 2/5
The sum of two consecutive even integers is -134 . What are the two numbers?