makaylahills2001 makaylahills2001
  • 25-11-2017
  • Business
contestada

The project sponsor, project team and the support staff would be the _____ project stakeholders.

Respuesta :

khansa23
khansa23 khansa23
  • 25-11-2017
Internal is the answer

Hope this helps ❤️
Answer Link

Otras preguntas

the sum of my digits is 12.when rounded off to the nearest hundred .i am 500.rounding to the nearest 10 makes me 530.what am I?
A plane intersects this rectangular prism perpendicular to the prism’s base. Which two-dimensional figure is the cross section that results from the intersectio
why does South Asia have a large steel industry
Separates substances on the basis of the boiling points of the substances a.filtration b.distillation c.crystallization d.chromatography
César Chávez said that he learned a lot from Gandhi and Martin Luther King, Jr. Which of their strategies did Chávez adopt? A. leading hunger strikes, marches,
How do you reduce 42/70- math
What is 0.07 as a fraction in simplest form?
What is the identity of a sample that has a mass of 8.97 g and a volume of 0.79 cm3? A.copper B.gold C.lead D.iron
what is 48/100 reduced
The creator of the containment policy was George F. __________.