Relative to the project's life cycle, when is the cost per risk discovered typically highest

Respuesta :

andriansp andriansp
  • 01-12-2017
Relative to the project's life cycle, the cost per risk discovered is typically highest during the end of closing of a project.
For any project, a lot of risk will only be spotted after the company started its own operation. Because up to this point, the company usually already determine which type of risk is the most likely to happen.
Answer Link

Otras preguntas

how many L in 1500mL
Which sentence does not contain any errors in comma usage? A. According to my uncle, the great outdoors, is the best place to be in the summer. B. Hey wat
what were some of the dangers that the riders faced on the pony express trail?
For the expression 5x?y3 xy2 8 to be a trinomial with a degree of 5, the missing exponent on the x-term must be .
What East Asian culture was known as the "Land of the Rising Sun." due to their location off the Pacific Coast? (Points : 1) Japan Korea China Indonesia
If I get 3% for my raise how much would that be
At 20.°C, a 1.2-gram sample of Mg ribbon reacts rapidly with 10.0 milliliters of 1.0 M HCl(aq). Which change in conditions would have caused the reaction to pro
Five different fractions that each simplify to two-fifths
What future world leader got his start during Germany's misery following World War I? Kaiser Wilhelm Otto Bismarck Adolf Hitler Benito Mussolini
who was the first president to enter into an undeclared war