Lolgirl6437 Lolgirl6437
  • 25-10-2017
  • History
contestada

How long did it take the bangladeshi people to build a dam across the feni river?

Respuesta :

jessicabogde
jessicabogde jessicabogde
  • 24-06-2019

about 1 year

1984-1985

Answer Link
Аноним Аноним
  • 25-11-2020

Answer:

Approximately one year.

Explanation:

The Bangladeshi people built the dam across the Feni river from 1984-1985, so it is one year.

Plz mark as Brainliest!

Answer Link

Otras preguntas

a student drops an object from the top of a building which is 19.6 m high. How long does it take the object to fall to the ground?
what is the first step to estimating 56 times 27
what is the adverb phrase in the sentence? Various types of campers with tents or RVs camp out with their families. A. of campers B. with tents or RVs C. with t
each person in the united states eats about 65 fresh apples each year. Based on this estimate, how many apples do 3 families of 4 eat each year?
please someone help me and explain this question to me (the last question starting with a straw)
Had been coaching Is which tense
what is the reciprocal of 10/9
How was the Atlantic slave trade different in the 1400s and 1500s than it was in the 1600s? A. In the 1400s and 1500s, more slaves were sold to Asian count
WHY IS IT IMPORTANT FOR AN IV SOLUTION TO HAVE SALT IN IT
Last month a manufacturing company shipped 452 boxes of ball bearings each box contains 48 ball bearings. How many ball bearings did the company shipped last mo