douggie2345
douggie2345 douggie2345
  • 22-05-2017
  • Mathematics
contestada

If 6 workers can cut the grass in 4 hours, how many workers will be needed to cut the grass in 3 hours?
A. 2 workers
B. 8
C. 12
D. 24

Respuesta :

Joshisboss
Joshisboss Joshisboss
  • 22-05-2017
The answer for this question is B
Answer Link

Otras preguntas

It takes1/3 hour to produce 1 woomble.how many woomble could be produced in 9 hours?
What was the Dreyfus affair?
what is the definition of material gains?
Identify the type of error in the sentence. If the sentence contains no error, select C. My reluctance to join your group is because I do not know your activiti
Laura cuts 64 inches of ribbon into two parts and gives her mom one part.Laura's part is 28 inches long.Her mom cuts her ribbon into 6 equal pieces.How long is
How did the Inca overcome geographical obstacles in building and ruling their empire?
Which decimal is equivalent to 7 -- 10 I'M SORRY I DIDN'T KNOW HOW TO DO THE 7 TENTHS BUT IT'S FRACTION A. 7.10 B. 0.7 C. 0.07 D. 0.007
All gymnosperms lose their leaves in the winter, is this true or false?
What is, 18 5/12+8 10/17+23 7/12+28 7/17
Which kind of sentence is this? Leaves are falling from the tree A. interrogative B. exclamatory C. imperative D. declarative