Differentiate between the scheduling techniques known as CPM and PERT

Respuesta :

foreverronneshia foreverronneshia
  • 25-03-2022
PERT is for Program Evaluation and Review Technique, whereas CPM stands for Critical Path Method. PERT is used to manage unpredictable activities, whereas CPM is used to manage predictable ones. PERT is concerned with events, whereas CPM is concerned with activities.
Answer Link

Otras preguntas

two years ago the water in a local reservoir fell 8 3/4 feet then it rose 4 3/5 how much did it change
Which processes of the water cycle return water vapor directly to the atmosphere?
The legal tradition that kept women from owning property and holding public office came to the United States from a. Mexico. b. Africa. c. Britain. d. Franc
Which of the following is not characteristic of the Tallmadge Amendment? As a group, the Southern representatives supported the amendment. Children of slaves wo
What are the two main things that cause external changes on Earth? A. weathering and erosion B. physical and chemical C. sheet and continental glaciers D. ho
How is multiplication using partial products different from multiplication using regrouping? how are they similar?
rewrite the numbers. then add 27+19
What type of association does the graph show between x and y? Linear positive association Nonlinear positive association Linear negative association Nonlinear n
Math please show work along with answer please
free the three numbers greater than 20 that has 9 as a factor