tonysibanda81 tonysibanda81
  • 25-01-2017
  • Mathematics
contestada

A 50-ft chain with mass density 5 lb/ft is initially coiled on the ground. How much work is performed in lifting the chain so that it is fully extended (and one end touches the ground)?

Respuesta :

phsfreshman phsfreshman
  • 25-01-2017
density is mass/ volume so the answer is 10
Answer Link

Otras preguntas

propose three ways in which the government can ensure that the help it offers is received only by the people who are in need
Gasoline costs 2.379 per gallon. Round to the nearest cent
When United States citizens visited Japan, what meant that they were only subject to American laws and not Japanese laws?
On January 20, a payroll check is automatically deposited. What is the current balance?
What is the sum of 18+27 as the product of their gcf and another sum
what factors affect the labor market
The writers of the constitution included an amendment process primarily to
Write 2.3181818 as a mixed number
The following is a frequency data set for test scores in a small class. Construct a cumulative frequency plot displaying the data on your own paper, calculator,
Suppose that an object starts at point a and travels in an arc to point b. The trajectory of the object is defined by what two measurements?