If 15 men can do a piece of work in 30 days, in how many days can 10 men complete the same work?

Respuesta :

irisf12346
irisf12346 irisf12346
  • 26-02-2022

Answer:

45

Step-by-step explanation:

n/15=30

therefore n=450

hence n/10 = 45

Answer Link
Zoyalane
Zoyalane Zoyalane
  • 26-02-2022

Answer:

45 days

Step-by-step explanation:

If 15 men = 30 days

1 man=30*15

1 man = 450 days

10 men = 450/10=45

Answer Link

Otras preguntas

nitrogen fixing bacteria change nitrate to ammonia
A rectangular hallway is 4.5 meters wide and has an area of 51.75 square meters. What is the length of the hallway, in meters? ​
help me with this problem ​
What is the equation of the line graphed below?
After every eighth visit to a restaurant you receive a free beverage. After every tenth visit you receive a free appetizer. If you visit the restaurant 100 time
How many whole numbers are between 0 and n+7? n is a whole number.
How does a robber baron become wealthy.
find the distance between -25 and -14
Identify the number 2.02200222000... as rational or irrational. Explain your reasoning
Gliding joint alows ?