gabegorelik gabegorelik
  • 22-10-2021
  • Mathematics
contestada

working simustainle 4 fudge machines finish a big job in 32 hours how long would it take if it had 4 times as more machines

Respuesta :

helloitzme1542 helloitzme1542
  • 22-10-2021

Answer:

8 hours

Explanation:

32÷4=8

It takes 4 machines to do something in 32 hours. If you had 4 times more machines it would be 4 times faster.

Answer Link

Otras preguntas

What is the layer of bedrock that is near Earth's surface that forms a continuous shell around Earth called?
what two word name makes up the scientific name of each kind of organism?
Malika's rectangular garden is enclosed with 24 m of fencing.What is the least possible area of Malika's garden?What is the greatest possible area?
The school hall is 4 times as long as it is wide. If the perimeter is 55m, what is the length? and what is the width?
What is the layer of bedrock that is near Earth's surface that forms a continuous shell around Earth called?
Are there any poisonous animals in Washington State?
What is another name for curl-ups? (8 letter word)
What are some examples of the word rueful in a sentence?
what's the answer to v+9/3=8
another one please help