yntuaigg5p yntuaigg5p
  • 24-12-2020
  • Mathematics
contestada

An artist has completed 1/4 of paintings in 2 weeks. At what rate is she working?

Respuesta :

facundo3141592
facundo3141592 facundo3141592
  • 29-12-2020

Answer: the rate is (1/8) paintings per week

Step-by-step explanation:

We usually define the rate as the amount of work done in some unit of time.

In this case, we know that the artist does 1/4 of a painting in 2 weeks, then the rate can be written as:

(1/4)/2  paintings/week = (1/8) paintings/week.

This means that the rate is (1/8) paintings per week, this is the weekly rate at which she works.

Answer Link

Otras preguntas

Use the formula m = to calculate the slope of the line. The slope of the line is .
Convert 4.565mm to m
According to ludy benjamin, if changes in physical stimuli always resulted in similar changes in perception of those stimuli, _____.​
Select which of the following texts you would need to plan BEFORE writing..
2m - nx = x + 4 with description
-5x/3+8=13 solve it
how would a high protein of food affect a puppy please help
Which character trait BEST describes Levi's behavior in his interaction with the head chef?
How did conflict affect the political climate in the nineteenth century Europe and the United States
If you interchange the coordinates of any point in Quadrant 2, in which quadrant would the new point be located?