UncleVictor6060 UncleVictor6060
  • 24-11-2020
  • Business
contestada

To _____ an activity means to shorten the time it will take. A. smash B. fund C. crash D. aggregate E. matrix

Respuesta :

adrianabazan
adrianabazan adrianabazan
  • 24-11-2020
The correct answer is:

C. crash
Answer Link

Otras preguntas

If susie accidentally touches a hot stove, which system does she rely on to tell her to pull her hand away?
39. The table shows the average U.S. crude oil imports in thousands of barrels per day. (8 points total) Determine the correlations coefficient, r, for a linear
Using the order of operations, which operation should you perform last to evaluate the expression below? ( 7 x 4 ) + (10 ÷ 2) x ( 14.7 - 9 ) A. multiplication
Question 1 (1 point) What is one theory for the beginning of the universe that states the universe formed by rapid expansion of matter and energy from an initia
Can someone please answer this, ill give you brainliest Would be very appreciated.
Find the slope of the line passing through the points (5,8) and (6,12).
Draw the structure of the major product formed in the given reaction when the aromatic aldehyde is present in excess
Who ever finishes 1-3 first gets marked brainliest
How are the overall structures of "The Value of Money" and "From Barter to Bitcoin" different? Drag the correct answer into the box. Correct Answer "The Value o
What does Junior think of Mary's new place