jaunapatterson5462 jaunapatterson5462
  • 23-07-2020
  • Business
contestada

To answer this question, refer to the crossover chart. For high volume production process, Process A would most likely be the best option. Group of answer choices True False

Respuesta :

Parrain
Parrain Parrain
  • 25-07-2020

Answer: False

Explanation:

For a high volume Process, Process C would be the best option because it has the lowest cost at higher volumes.

Process A would be the best option if the company was looking for a low volume production process because at that point, it has the lowest cost. When it comes to high volume production though, Option A is the worst option as it is the most expensive.

Ver imagen Parrain
Answer Link

Otras preguntas

A blank is a determination of an amount of something.
If the Greek genius was politics, the Roman genius was _____
9. Many job options for high school graduates in Honduras are in what field? (1 point)
Brittany wants to make cookies for the whole fourth grade. One batch of dough makes 2 dozen cookies. There are 68 fourth grader at her school.Is it reasonable t
Which is an example of secession? A) Adding states to the union, B) Taking a state out of the union, C) Allowing slaves to participate in government, D) None of
For which operations is the set {0, 1} closed? Choose all answers that are correct. a. multiplication b. division c. addition d. subtraction
what is the value of 2 in 2,553?
A well stocked first aid kit should include what type of product for cleaning wounds A. Aloe Vera B. Benzoin C. Antibiotic Ointment D. Witch Hazel
9. Many job options for high school graduates in Honduras are in what field? (1 point)
What is another name for dehydration synthesis