matthewmui8 matthewmui8
  • 22-05-2020
  • Mathematics
contestada

if 4 workers can complete a job in 12 days, how many days will it take 3 workers to complete the same job

Respuesta :

babygirl2821
babygirl2821 babygirl2821
  • 22-05-2020
Is there any answer or something
Answer Link

Otras preguntas

Which factor would increase the carrying capacity for white-tailed deer in an Easton temperate forest ecosystem?
The gas tank is 20% full. the volume is 288.75. at $3.00 per gallon of gas, find the cost to fill the tank. (1 gal = 231 in.33)
When an arguer attacks another arguer's character instead of that person's arguments, he or she has probably committed the fallacy of appeal to force. a. True
What did 15th and 16th century European explorers find in the Americas?
In the number 432.901, what digit in the tens place
The following sentence contains a(n) BLANK clause. "We moved because our house was too small." Adjective Noun Or, Adverb
Pablo put $1,260 into a savings account that earns 3% simple interest per year. He does not make any deposits or withdrawl. How much money will be in pablo's ac
When a cell undergoes mitosis, each daughter cell will have ______ the number of chromosomes as the parent cell?
HELP ME DAMMIT A coach needs to rank his top 2 players in order. How many possible ways can this be done if there are 25 boys on the team
Sue has 55 inch of ribben. She wants to cut the ribbon into 6 equal pieces. How long will each pieces be?