30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

Аноним Аноним
  • 23-02-2020
30 men -> 40 days
1 man -> 1/1/3 days
30-5men = 25 men
25 men -> 1/1/3 x 25
= 33/1/3 days
Answer Link
tolaosunrinde
tolaosunrinde tolaosunrinde
  • 23-02-2020

Answer: 48 days

Step-by-step explanation:

If it takes 30men 40days to complete a task, 1 man takes 30×40= 1200 days

25 men will therefore take 1200/25= 48 days.

Answer Link

Otras preguntas

The figure below is made of two identical triangular prisms. What is the volume of the figure?
how much is 300000 *​
find the quotient of 25.5÷0.5​
The angles below form a linear par. What is the measure of angle abc
Please answer this correctly
what is the literacy rate of Norway (pls answer correctly)?
URGENT!!LAST 3 QUESTION!!!! PLS JUST TAKE A LOOK! EASY BUT I AM DUMB!!!!!! WILL GIVE BRANLIEST!! 1. If a triangle has two angles that measure 57 and 94 degrees,
y=p2 +gr Find y when p=-5, q=3 and r=-7. Write p in terms of q, r and y.
In the diagram below, if AEB=50°, find the measure of DEC.
Suppose that IQ scores have a bell shaped distribution with a mean of 101 and a standard deviation of 12. Using the empirical rule what percentage of IQ scores