Resource leveling is a network scheduling technique that seeks to assign nearly equivalent work units to each member of the project team True False

Respuesta :

Emhicee
Emhicee Emhicee
  • 26-01-2020

Answer:

False

Explanation:

Resource leveling in project management is a technique used to ensure that over-allocation of resource or conflicts as a result of over-allocation does not occur.

Cheers

Answer Link

Otras preguntas

Which contains an error in logic as worded? Arthur's dream since he was a little boy was of becoming an Olympic gymnast. Arthur's dream since he was a little bo
What is the slope of this line?
Wich task is part of narrowing down a subject for a paper
Hudson is performing an experiment by tossing a paper cup into the air and recording how it lands. He determines that there are three possible outcomes for how
5^2x=28 (Help me please!!!!!!)
Has christianity always been most popular
Photosynthesis is the process by which plants and algae use energy from the sun to synthesize
A computer store buys a computer system at a cost of $465.60. The selling price was first at $776, but then the store advertised a 30% markdown on the system. F
Read these lines from the poem. Did He smile His work to see? Did He who made the lamb make thee? These lines allude to God or a creator. How does
What is 33000 times 800