bwheeler8209 bwheeler8209
  • 26-02-2019
  • Business
contestada

Who can sign a determination and findings justifying the use of an award-fee contract

Respuesta :

MrsTriplet MrsTriplet
  • 07-03-2019

A person that in at least one level higher than the contracting officer is allowed to sign a determination and findings justifying the use of an award-fee contract. An award fee contract is defined as additional profit or fee aount that is awarded based on evaluations during different periods of time for contractors on their performance. This type of evalution is done based on the specific company and their needs.  

Answer Link

Otras preguntas

What are three methods the US used to counteract the influences of the Soviet Union?
Today, the Great Pyramid at Giza near Cairo, Egypt stands 137 meters tall, coming to a point.Its base is a square with each side measuring 230 meters wide. What
if you observed that an em wave had a wavelength of 10-12m, what sort of wave is it?
Each degree on the Kelvin scale equals how many degrees on the Celsius scale? -1 -10 -no relationship (different scale) -2.12
How can you determine whether a number is a solution of an equation ?
How many square feet of paper do you need to cover a cube with a side 10 in. long? Round your answer to two decimal places. A. 4.17 sq ft B. 86.40 sq ft C. 6.94
What is the female reproductive organ that produces egg cells
greatest common factor for 95 and 76
What is the solution to the equation? 4(3 + 7) = 4 • x + 4 • 7 A. x = 3 B. x = 4 C. x = 7 D. x = 10
which is an inccorect rounding of 53.864