ariannagonzalez11 ariannagonzalez11
  • 22-06-2018
  • Mathematics
contestada

A construction company can remove 2/3 tons of dirt from a construction site each hour . how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Americ
Americ Americ
  • 22-06-2018
Set up a ratio to compare the two proportions.

x= number hours to remove 30 ton


(2/3 ton)/ 1 hour= (30 ton)/(x hours)
cross multiply

(2/3)(x)= (1)(30)

2/3x= 30
divide both sides by 2/3

x= 30 ÷ 2/3
to divide by fraction, multiply by reciprocal of 2/3

x= 30 * 3/2
multiply numerators

x= (30*3)/2

x= 90/2

x= 45 hours


ANSWER: It will take 45 hours to remove 30 tons of dirt.

Hope this helps! :)
Answer Link

Otras preguntas

steps to run a Q-BASIC programme​
A, B & C form a triangle where ∠ BAC = 90°. AB = 9.1 mm and CA = 12.5 mm. Find the length of BC,
Question: State whether each table of values represents a function​
Writing! Write a reply to Lara (150-200 words). Say what you think she should do HELP MEEEE
A playground is rectangular with a length of 1/2 miles. If the area of the playground is 5/8 square miles, what is its width? Input your answer as a fraction.
HELP ASAP!!!! Describe some of the major changes that have taken place in health care delivery over the years. How have the changes been reflected in Florida
Harry buys a TV priced at £1200 plus 20% VAT. He pays £300 deposit and the balance in ten equal monthly payments. Calculate each monthly payment. please explain
how do I get better at Anatomy and Proportions?
what is the conflicts between maximums and commodes that drives the movie ?
Differentiate between the focus and the epicenter of an earthquake.