litttyyyu85142 litttyyyu85142
  • 26-02-2024
  • Mathematics
contestada

Apples are prepared in a process with two resources. the first resource has a capacity of 2.1 apples per minute. the capacity of the second resource is 4.4 apples per minute. demand for this process is 1.6 apples per minute. what is the cycle time of this process (in seconds)?

Respuesta :

Otras preguntas

A 1.0 kg book is lifted 0.5 m above the table , but the table is 1.0 m above the floor , what would be the P.E of the book if the reference level where the flo
What is the most current NASA mission on Mars?
A ball of mass 2 kg is kept on the hill of height 3 km. Calculate the potential energy possessed by it ?How can I get the potential energy ?
what do you call a baby zebra?
Q2. In a 4x100 m relay race, total track length is 200m and time taken by one particular group is 50.2 s. What is the average speed and average velocity of that
find the value of x , if log₂ [log₅ (log₃x)] = 0
why is gold preferred as a superior metal over silver and bronze?
Which of the number(s) below are potential roots of the function?p(x) = x4 + 22x2 – 16x – 12
can you guys help me out with number 13
What are 3 things an Apple, Knife and Mirror have in common?