the following represents a project with known activity times. all times are in weeks. activity immediate predecessor time a -- 4 b -- 3 c a 2 d b 7 e c, d 4 f b 5 g e, f 4 01. what is the minimum possible time required for completing the project?

Respuesta :

Otras preguntas

Which of the following is not a possible cause of erosion? a. burrowing animals b. gravity c. water d. none of the above
Which is the properly balanced equation that shows the synthesis of limewater, Ca(OH)2, from calcium oxide and water?
How do you solve 90.5 divided 7.3?
What system includes oxygen, nitrogen, and ozone? a. geosphere b. hydrosphere c. atmosphere d. biosphere
The product of 9 and a number is 12 less than three times that number. What is the number?
The product of 9 and a number is 12 less than three times that number. What is the number?
An acid has ________ hydrogen ions than a base. a. less b. the same number of c. more d. none of the above
A manufacturer buys bolts from a supplier. The bolts cost 0.17 cents each, but the manufacturer made a deal with the supplier and get 4000 bolts for $595.50. To
How do I solve this problem w
What is the weight of blaines lunch to the nearest pound? Lunch:6.1 kg